Bid guide

How to bid on transit facility floor recoating for the City of Santa Clarita

City of Santa Clarita CACloses November 20, 2026

What the City is buying

The City of Santa Clarita wants about 12,000 square feet of flooring recoated at its transit maintenance facility. The work includes removing the existing coating down to the concrete, applying a built-in moisture-control system, and installing high-strength, high-traffic epoxy with non-slip grit in the existing pattern.

The project is federally funded. It may suit contractors with experience in concrete surface preparation and commercial or industrial epoxy flooring.

Key dates and the deadline

Questions are due November 9, 2026. The response deadline is November 20, 2026, at 2:00 PM ET.

Submit through BidNet Direct, or follow the notice's submission directions, before the closing time. Do not wait until the deadline to upload or send your response.

Who this opportunity may suit

This construction opportunity is relevant to flooring contractors able to remove existing coatings to concrete and install moisture-control systems and durable epoxy flooring with non-slip grit.

Before deciding to bid, review the solicitation documents and addenda for the full scope and any requirements that affect your ability to perform the work.

How to access and respond

Open the solicitation on BidNet Direct using the “View original source” option. The listing is titled “Transit Maintenance Facility Maintenance Floor Recoating” and has solicitation number 0000441309.

The title and dates are public. Sign in with a free BidNet Direct vendor account to see the full notice, documents and addenda. Submit your response through BidNet Direct, or as the notice directs, before the deadline.

Prepare a clear, competitive response

Read the full documents and every addendum before preparing your response. Check that your work plan addresses the stated sequence: coating removal to concrete, moisture control, and the new epoxy finish with non-slip grit in the existing pattern.

Send questions by the November 9 due date if the documents leave important points unclear. Allow time to check your response for completeness and confirm that the submission has gone through before the November 20 deadline.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from City of Santa Clarita; the original posting controls.