Bid guide

How to bid on a bridge replacement contract for the Texas Department of Transportation

Texas Department of Transportation TXCloses October 7, 2026

What the agency is buying

The Texas Department of Transportation (TxDOT) is seeking a contractor to replace a bridge on US 90 in Terrell County, Texas. This is a construction opportunity with an estimated value of $6,089,616.17.

This project is significant for construction firms looking for state-level infrastructure work. Securing such a contract can provide substantial revenue and demonstrate capability in large-scale bridge projects.

Key dates and deadlines

The solicitation was published on September 11, 2026. The deadline for submitting responses is October 07, 2026, at 2:00 PM ET. All responses must be submitted by this time.

It is crucial to mark this deadline and ensure all required documents are prepared and submitted well in advance. Late submissions are typically not accepted.

Who this opportunity suits

This opportunity is ideal for established construction firms with experience in bridge replacement projects, particularly those familiar with highway infrastructure work. Companies specializing in heavy civil construction and state Department of Transportation contracts would find this suitable.

The project's estimated cost suggests it is geared towards businesses capable of managing multi-million dollar contracts and possessing the necessary equipment, personnel, and financial stability to execute such a large-scale construction effort.

How to respond

To access the full solicitation documents and instructions, you need to view the original posting on the Texas Electronic State Business Daily (ESBD). The solicitation number is 0022-01-034_1026.

Viewing the posting and its associated documents is public and does not require an account. Follow the specific submission instructions provided within the posting to submit your response before the deadline.

Practical tips for a competitive response

Thoroughly review all sections of the solicitation, paying close attention to the scope of work, technical specifications, and any specific requirements for materials or construction methods. Ensure your proposal directly addresses each point.

Prepare a detailed cost breakdown that is both competitive and realistic. Highlight your firm's relevant past performance, especially on similar bridge or highway construction projects, to demonstrate your capability and experience.

Double-check all forms and certifications for accuracy and completeness before submission. A well-organized and error-free response reflects professionalism and attention to detail, which can be a significant factor in evaluation.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Texas Department of Transportation; the original posting controls.