Bid guide
How to bid on Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Dept of the Navy
What the Navy is buying and why it matters
The Department of the Navy plans to award approximately five major construction contracts for its Shipyard Infrastructure Optimization Program (SIOP). This effort focuses on building a new Multi-Mission Dry Dock at Naval Base Kitsap in Bremerton, Washington. Work may also occur at Pearl Harbor Naval Shipyard and other Naval Facilities Engineering Systems Command (NAVFAC) locations.
These contracts could have a maximum value of $30 billion over up to ten years. Typical task orders are expected to range from $2 billion to $6 billion. Each contract holder will receive a minimum guarantee of $2 million. This is a significant opportunity for large construction firms.
Key dates and what happens at the deadline
This is a preliminary pre-solicitation notice, not a request for proposals. The Navy anticipates holding an Industry Day in August 2026. The formal solicitation (Request for Proposal) is expected to be issued in September 2026. Phase I proposals would be due in October 2026, and Phase II proposals in January 2027.
Contract awards are anticipated in May 2027. The deadline mentioned, September 30, 2026 at 3:00 PM ET, is for this preliminary notice and does not represent a proposal submission deadline for the main contract.
Who this opportunity suits
This opportunity is suitable for very large construction firms with extensive experience in major waterfront and marine infrastructure projects. Companies must demonstrate a single-project bonding capacity of $2 billion to qualify.
The work involves Design Build (DB) and Design Bid Build (DBB) type projects, including dry dock construction, demolition, dredging, utility installation, and related infrastructure. Firms specializing in large-scale civil engineering and marine construction will find this relevant.
How to access the opportunity
To view the original source of this opportunity on the portal, click the “View original source” link. If the first click takes you to the portal’s homepage, click the link again to go directly to the bid.
You may need to create a free account to access all documents, though this is not always required for every bid.
Tips for preparing a competitive response
Given the scale and complexity of this project, start preparing early. Attend the planned Industry Day in August 2026 to gain insights and network. Begin assembling your team and identifying potential subcontractors or joint venture partners, especially those with relevant experience in large-scale dry dock or shipyard construction.
Focus on clearly demonstrating your firm's experience with projects of similar scope, size, and complexity. Highlight your bonding capacity and financial stability. Develop a robust plan for managing a multi-billion dollar, multi-year construction program, addressing potential challenges in logistics, environmental compliance, and security within a naval base setting.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Dept of the Navy; the original posting controls.