What the agency is buying

The Department of Agriculture needs a contractor to remove an existing concrete drainage pad at Building #11 and install a new one. This primary work involves a pad approximately 6 feet by 48 feet and 6 inches deep. The project includes all necessary labor, materials, equipment, site preparation, fill, rebar, drainage detailing, and cleanup.

Vendors should also provide separate pricing for two optional tasks: installing a new concrete pad at Building #28 (about 25 by 30 feet) and installing a new concrete ramp with railing at Building #12 (about 28 by 90 feet). These options also require demolition, site work, and all associated materials and labor.

Key dates and deadlines

This solicitation was published on September 09, 2026. All responses are due by September 23, 2026, at 5:00 PM ET. It is important to submit your proposal before this deadline, as late submissions are typically not considered.

Who this opportunity suits

This opportunity is suitable for construction firms with experience in concrete demolition, pouring, and site preparation. Companies specializing in general construction, concrete work, or landscaping with a strong focus on structural concrete projects would be a good fit. The project requires furnishing all skilled labor, materials, equipment, tools, transportation, and supervision.

How to respond

To access the solicitation documents, click the “View original source” link. If the first click takes you to the portal’s homepage, click the link again to go directly to the bid. You may need to create a free account on the portal to view all documents, though this is not always required for every bid.

Tips for a competitive response

When preparing your response, clearly separate your pricing for the base work on Building #11 from the two optional tasks for Building #28 and Building #12. Ensure your technical proposal details how you will meet all specifications, including the use of minimum 1/2 inch rebar and proper drainage runoff.

Highlight your experience with similar concrete demolition and installation projects, especially those involving site preparation, fill, and specific drainage requirements. Provide a clear plan for managing all aspects of the project, including labor, materials, equipment, and supervision, to demonstrate your capability to handle the scope of work effectively.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Forest Service; the original posting controls.