Bid guide

How to bid on Merimere Dike Seepage Control for CT DAS Procurement

State of CT - DAS Procurement CTCloses October 6, 2026

What the agency is buying

The State of Connecticut, through DAS Procurement, is seeking bids for subsurface pressure injection grouting at Merimere Dike on Reservoir Road in Meriden. This project involves preparing the site, performing the grouting work under or around the existing dike, and then restoring the site to its original condition.

This is a construction opportunity for firms specializing in earthwork and injection grouting. The project is funded by the Environmental Protection Agency, which means that Federal Labor Standards Provisions, including Davis-Bacon prevailing wage requirements, will apply where applicable.

Key dates and deadlines

This Invitation for Bid (IFB) was published on August 21, 2026. All responses must be submitted by the deadline of October 06, 2026, at 11:00 AM ET. It is important to submit your bid before this exact time, as late submissions are typically not accepted.

Who this opportunity suits

This opportunity is suitable for construction firms with expertise in subsurface pressure injection grouting, dike maintenance, and site restoration. Companies familiar with federal labor standards and prevailing wage requirements will find this bid particularly relevant. The work falls under the construction category.

How to respond

To access the full bid documents and submit a response, you need to go to CTsource, Connecticut's statewide procurement portal. You can view the bid details without an account. However, to download documents or submit your proposal, you will need to create a free CTsource account. Ensure your account is set up well before the submission deadline.

Tips for a competitive response

When preparing your bid, carefully review all specifications related to the subsurface pressure injection grouting and site restoration. Provide clear details on your proposed methods, equipment, and materials. Highlight your firm's experience with similar dike or water retention structure projects.

Pay close attention to the requirements regarding Federal Labor Standards Provisions and Davis-Bacon prevailing wages. Ensure your cost proposal accurately reflects these labor costs. A well-organized and thorough response that directly addresses all aspects of the solicitation will strengthen your bid.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from State of CT - DAS Procurement; the original posting controls.