Bid guide
How to bid on Government Owned Pre-Engineered Steel Building Erection for DEPT of Defense
What the agency is buying and why it matters
The Department of Defense needs a contractor to erect a government-furnished pre-engineered steel building at Granger Lake, Texas. This involves providing all necessary tools, equipment, labor, and supervision. The contractor will also supply any additional materials not provided by the government, subject to approval.
Before starting erection, the contractor must inspect the concrete foundation, anchor bolts, slab elevation, and bearing plates to ensure they meet installation requirements. The building must be erected according to the manufacturer's instructions and approved drawings. This opportunity is for construction firms experienced in metal building systems.
Key dates and what happens at the deadline
This solicitation was published on August 28, 2026. All offers are due by September 14, 2026, at 10:00 AM CST. This is equivalent to 12:00 PM ET.
It is crucial to submit your offer before the deadline. Late submissions are generally not accepted and will likely result in your bid being disqualified.
Who this opportunity suits
This opportunity is suitable for construction firms with expertise in erecting pre-engineered steel buildings. Contractors should be familiar with metal building systems and the associated inspection and erection processes.
The relevant category for this work is construction, specifically involving structural steel erection and metal building installation. Firms must be capable of providing all necessary labor, equipment, and supervision for such a project.
How to respond to this solicitation
To access the full opportunity details and documents, you need to click the “View original source” button. The first click might take you to the portal’s homepage; if so, click the button again to go directly to the bid.
You may need to create a free account on the portal to view all the documents. However, for many bids, you can view documents without an account.
Practical tips for a competitive response
Carefully review the Statement of Work (SOW) and all attachments. Pay close attention to SOW Section 13 34 19 METAL BUILDING SYSTEMS and the requirements for inspecting the foundation and anchoring prior to erection.
Ensure your proposal clearly outlines your approach to providing all required tools, equipment, labor, and supervision. Detail your plan for inspecting the existing foundation and how you will ensure compliance with manufacturer's instructions and industry standards. Highlight your experience with similar pre-engineered steel building projects.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.