Bid guide

How to bid on GAOA LDV Crystal Lakes Water & Septic Resuscitation for the Dept. of Agriculture

Forest Service Leadville, COCloses September 15, 2026

What the agency is buying

The Department of Agriculture needs a contractor to restore water and septic systems at Crystal Lakes in the Pikes Peak National Forest, Colorado. This project involves significant construction work.

Key tasks include installing a new 2-inch HDPE waterline under Colorado Highway 24, upgrading well and booster pumps, and performing associated electrical work. Multiple septic systems will be replaced, along with new sewer and dosing infrastructure. The project also requires asphalt removal and the installation of a new road and gate.

Key dates and deadlines

This solicitation was published on September 1, 2026. All proposals must be submitted by September 15, 2026, at 5:00 PM ET. It is crucial to submit your proposal before this deadline.

Who this opportunity suits

This opportunity is suitable for construction firms with experience in water and septic system installation and repair, utility engineering, electrical upgrades, and road construction. Companies familiar with working in national forest environments and adhering to specific highway department requirements will find this relevant.

How to respond

To access the solicitation, click “View original source” on the portal. If the first click leads to the portal's homepage, click it again to go directly to the bid. You may need a free account to view all documents, though this is not always required.

Amendment 0001, which includes RFI questions and answers and the pre-bid sign-in sheet, has been posted. Bidders must acknowledge and submit the SF30 form with their proposal.

Tips for a competitive response

Carefully review all solicitation documents, including Amendment 0001, to understand the full scope of work and any updates. Pay close attention to the RFI questions and answers, as these often clarify important aspects of the project.

Ensure your proposal clearly addresses all technical requirements for the waterline installation, pump upgrades, electrical work, and septic system replacements. Provide a detailed plan for managing the work, especially concerning the installation under Colorado Highway 24 and coordination for CDOT permitting. Double-check that the required SF30 form is acknowledged and submitted with your proposal.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Forest Service; the original posting controls.