Bid guide
How to bid on the FY27 NE Kirksville Maintenance Building Metal Siding Project for MoDOT
What MoDOT is buying and why it matters to vendors
The Missouri Department of Transportation (MoDOT) is looking for contractors to remove existing vinyl siding and install new 26-gauge prefinished metal siding on its Kirksville Maintenance Building. This is a direct opportunity for businesses specializing in commercial siding installation and building maintenance.
Winning this bid means securing a contract with a state agency, which can provide stable work and a strong reference for future government projects.
Key dates and what happens at the deadline
This Invitation for Bid (IFB) was published on August 17, 2026. The deadline for submitting bids is September 17, 2026, at 3:00 PM ET. All bids must be received by this time.
A mandatory site visit is required for all bidders. If you plan to submit a hard copy bid, you must contact the buyer five business days before the bid closing date.
Who this opportunity suits
This opportunity is ideal for construction firms, general contractors, or specialized siding companies with experience in commercial building renovations and metal siding installation. Companies familiar with state government contracting procedures will also find this suitable.
The project falls under the facilities category, specifically for building exterior maintenance and upgrades.
How to respond to this solicitation
To access the full solicitation documents and respond, you need to go to the State of Missouri Oracle procurement portal. You can view the negotiation's public abstract directly without signing in.
Once on the portal, review the summary, lines, and listed documents. If you need to download documents or submit a response, you will need to register a free supplier account on the Oracle portal. Bids can be submitted electronically through MissouriBUYS or by mail, UPS, or FedEx. Remember to attend the mandatory site visit.
Practical tips for preparing a competitive response
Since a site visit is mandatory, ensure you attend to fully understand the scope of work and any specific site conditions. This will help you prepare an accurate and competitive bid.
Carefully review all five attachments provided with the IFB. These documents will contain detailed specifications, drawings, and terms and conditions that are crucial for your proposal. Pay close attention to the requirements for the 26-gauge prefinished metal siding.
If submitting a hard copy bid, make sure to contact the buyer, Logan Wilbers, via email at [email protected], five business days before the bid closing. This ensures your hard copy submission is expected and properly processed.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from State of Missouri; the original posting controls.

