Bid guide
How to bid on Freshwater Bayou Maintenance Dredging for the Dept of the Army
What the Army Corps of Engineers is buying
The Department of the Army needs a contractor for maintenance dredging of a 5.3-mile section of the Freshwater Bayou Channel in Louisiana. This project involves removing material down to 16 feet below the water line. All dredged material must be transported and deposited on the Gulf shoreline west of the channel, as detailed in the contract drawings.
This is a significant construction opportunity, with an estimated value between $10 million and $25 million. It is open to all bidders, making it accessible for various firms in the construction sector.
Key dates and what happens at the deadline
This solicitation was published on June 22, 2026. The deadline for responses is June 18, 2028, at 11:00 AM ET. All proposals must be submitted by this time. The exact bid opening date will be established by amendment to the solicitation.
Who this opportunity suits
This project is ideal for construction firms with experience in dredging operations, particularly those familiar with marine construction and material disposal on shorelines. The relevant industry code is NAICS 237990, which covers other heavy and civil engineering construction. Given the project's magnitude, firms capable of handling large-scale dredging work will find this opportunity suitable.
How to respond to this solicitation
To access the full solicitation details, click the “View original source” link. If the first click takes you to the portal’s homepage, click the link again to go directly to the bid. You may need to create a free account on the portal to view all documents, though this is not always required for every bid.
Tips for preparing a competitive response
When preparing your response, focus on demonstrating your firm's specific experience with similar dredging projects, especially those involving precise depth requirements and shoreline disposal. Highlight your equipment capabilities and your team's expertise in managing large-scale marine construction. Pay close attention to the five drawings and specifications included in the solicitation, as these will provide critical details for your proposal.
Ensure your proposal clearly outlines your methodology for material removal and disposal, showing how you will meet the elevation requirements and deposit the material as specified. A well-structured proposal that addresses all technical requirements and demonstrates a clear understanding of the project's scope will be more competitive.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Dept of the Army; the original posting controls.
