Bid guide

How to bid on a Replacement Cooling System for Hagaman Memorial Library, East Haven

Town of East Haven CTCloses October 8, 2026

What the Town of East Haven is buying

The Town of East Haven is seeking qualified HVAC contractors to purchase, deliver, and install a replacement HVAC cooling system at the Hagaman Memorial Library. This project is located at 227 Main Street, East Haven, Connecticut. The installation is planned for March to April 2027. This project is partly funded by a Connecticut State Library Construction Grant and town capital funds.

Key dates and deadlines

A mandatory site walkthrough is scheduled for September 17, 2026, at 10:00 a.m. All prospective bidders must attend this walkthrough to qualify for bid submission. The deadline for submitting your bid is October 08, 2026, at 2:00 PM ET. The bid opening will occur on the same date. The town aims to make an award by the end of October 2026 to allow for equipment ordering and timely installation.

Who this opportunity suits

This opportunity is suitable for qualified HVAC contractors. Firms with experience in large-scale cooling system replacements, particularly in public or institutional buildings, will find this relevant. The project falls under the construction category, specifically HVAC installation and upgrades.

How to respond to this solicitation

To access the full solicitation documents and respond, you will need to use CTsource, Connecticut's statewide procurement portal. Viewing the bid details is public and does not require an account. However, to download documents or submit your response, you will need a free CTsource account. Ensure you complete your submission before the October 08, 2026, 2:00 PM ET deadline.

Tips for preparing a competitive response

Since a mandatory site walkthrough is required, make sure to attend and take detailed notes. This will help you understand the existing conditions and potential challenges, allowing you to submit a more accurate and competitive bid. Clearly outline your experience with similar HVAC replacement projects, especially those involving public buildings or state funding. Pay close attention to all specifications and requirements in the bid documents to ensure your proposal is fully compliant. Double-check all pricing and ensure your proposed timeline aligns with the March-April 2027 installation window.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Town of East Haven; the original posting controls.