Bid guide
How to bid on Design Build for Vertical Conveyance Projects Phases 2 - 4 for Orange County
What the County of Orange is buying
The County of Orange is looking for qualified firms to provide design and construction services for their Vertical Conveyance Projects, specifically Phases 2 through 4. This is a design-build opportunity, meaning the selected firm will be responsible for both the design and construction aspects of the project.
Key dates and what happens at the deadline
Statements of Qualifications (SOQ) are due by September 18, 2026, at 5:00 PM ET. After this deadline, the County of Orange will review all submitted SOQs. Firms whose qualifications are selected will then be invited to participate in the next stage, which is a Request for Proposals (RFP).
Who this opportunity suits
This opportunity is suitable for construction firms with expertise in design-build projects, particularly those involving vertical conveyance systems. Firms should have a strong track record in both design and construction services for similar projects. The category for this work is construction.
How to respond
To access the solicitation and submit your response, you need to go to the OpenGov Procurement portal. You will need to sign in or create a free vendor account on OpenGov Procurement. This account will allow you to download plans, ask questions, join the planholders list, and submit your Statement of Qualifications before the deadline. Any updates or addenda will also be communicated through OpenGov.
Practical tips for preparing your response
When preparing your Statement of Qualifications, focus on clearly demonstrating your firm's experience and capabilities in design-build projects, specifically those related to vertical conveyance. Highlight relevant past projects, your team's expertise, and your approach to managing both design and construction phases effectively. Ensure all required documentation is complete and submitted on time through the OpenGov portal. Pay close attention to any specific criteria or requirements outlined in the solicitation documents to ensure your SOQ addresses them thoroughly.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from County of Orange; the original posting controls.

