Bid guide

How to bid on Siting, Transmission, and Environmental Protection (STEP) Peak Workload for Energy Resources Conservation

Energy Resources Conservation CACloses October 2, 2026

What the agency is buying

Energy Resources Conservation is looking for assistance with its Siting, Transmission, and Environmental Protection (STEP) Small Power Plant Exemption (SPPE) peak workload. This is an opportunity for vendors who can support environmental protection and power plant siting needs.

The full scope of work and detailed requirements are available in the solicitation documents on the California State Contracts Register.

Key dates and deadlines

The deadline to submit your response for this Request for Quotation (RFQ) is October 02, 2026, at 2:59 AM ET. All responses must be submitted before this time.

Late submissions may not be considered, so it is important to plan accordingly and allow sufficient time for submission through the Cal eProcure portal.

Who this opportunity suits

This opportunity is suitable for firms with expertise in environmental protection, power plant siting, and transmission. Vendors with experience in supporting government agencies with peak workload demands in these categories would be a good fit.

The solicitation is categorized under environmental services, indicating a need for specialized knowledge in this area.

How to respond

To access the solicitation, click on the “View original source” link. This will take you directly to the posting on Cal eProcure, California’s eProcurement portal.

You can view the posting and its associated documents without needing an account. However, to submit your response, you will need a free Cal eProcure sign-in. Follow the specific instructions provided in the posting for submitting your bid before the deadline.

Diana Grady is the point of contact for this solicitation. Her email is [email protected].

Tips for a competitive response

Carefully review all solicitation documents to fully understand the scope of work, requirements, and evaluation criteria. Tailor your response to directly address each point raised by the agency.

Ensure your proposal clearly demonstrates your firm's relevant experience and capabilities in environmental protection, power plant siting, or similar projects. Highlight any specific expertise that aligns with the Siting, Transmission, and Environmental Protection Small Power Plant Exemption context.

Pay close attention to all submission instructions on Cal eProcure. Double-check that all required forms and documents are completed accurately and submitted on time. Technical issues can occur, so do not wait until the last minute to submit your response.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Energy Resources Conservation; the original posting controls.