In plain English

FDOT seeks a contractor to improve traffic signals and make related roadway, lighting, fiber-optic, and sidewalk work at three intersections on US 1 in Stuart and unincorporated Martin County. The project covers 0.227 miles, has an estimated budget of $3,205,618, and allows 315 contract days. Bids are due through Bid Express by December 2, 2026, at 10:30 a.m. Eastern.

About this opportunity

The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, barrier, ped LCD, arrow board, signalization, traffic detection, PCMS, business sign), monitor structures (inspection, settlement, vibration), environmental protection (sediment barrier, inlet, tree), earthwork (excavation, embankment, borrow), concrete (removal, curb, gutter, separator, sidewalk, driveway), asphalt (stabilization, base, milling, resurfacing), pavement markings (detectable, RPM, painted, thermo, bike lane), signing (single-column, internally-illuminated), lighting (conductors, load center, luminaire, pole complete, cable distribution), IST (subsurface doc,…

Time remaining

Closes Dec 2, 2026

32Days
:
04Hours
:
33Min
:
00Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-5A0AE2