Opportunity timeline

PostedOct 28, 2026
DeadlineNov 19, 2026

In plain English

Westborough is seeking a contractor to rehabilitate about 950 feet of 8-inch water main along Route 9 and Otis Street, including structural lining and installation of about 270 feet of new ductile iron pipe. The work also includes replacing valves and hydrants, temporary bypass piping, and removing and legally disposing of asbestos-containing pipe and material. Excavation must start no earlier than April 1, 2027, and be completed by May 27, 2027.

About this opportunity

The Work consists of the installation of a structural liner in an existing 8-inch diameter asbestos-concrete (AC) water main within the Route 9 right-of-way from Otis Street to Station 4+85 and within Otis Street from Station 0+00 to 4+56 in Westborough, MA. The length of water main to be lined will be approximately 950 feet. The Work also includes installation of approximately 270 feet of 8-inch ductile iron water main. Existing AC pipe will be removed within the access pits to install the liner and will be replaced with new 8-inch DI water main and tied-in to the existing main. Gate valves and hydrant assemblies within the limits of work will also be replaced with new DI valves and…

Time remaining

Closes Nov 19, 2026

21Days
:
11Hours
:
07Min
:
59Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-EBECCD