Opportunity timeline

PostedOct 28, 2026
DeadlineDec 8, 2026

In plain English

Sumter School District is seeking construction of a 7,200-square-foot pre-engineered metal building for a new weight room at Sumter High School in Sumter, South Carolina. The project uses a design-bid-build approach. A pre-bid meeting is scheduled for November 10, 2026, at 10:00 a.m. at the school; contact Hal Fuller for the full scope, specifications, and drawings.

About this opportunity

A 7200 SF (40’ x 180’) pre-engineered metal building construction for a new Weight Room for Sumter High School. For full scope of work, specifications and drawings or any questions or concerns please contact Hal Fuller. Emal: [email protected] Phone: 843-662-9961 Pre-bid Date and time: 11/10/2026 @ 10:00 am @ Sumter High School Solicitation number: 2529. Project location: Sumter High School, 2580 McCrays Mill Road, Sumter SC 29154. Delivery method: Design-Bid-Build. Point of contact: Hal Fuller ([email protected]).

Time remaining

Closes Dec 8, 2026

40Days
:
13Hours
:
54Min
:
13Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-AE4F35