Opportunity timeline

PostedOct 27, 2026
DeadlineNov 17, 2026

In plain English

The U.S. Space & Rocket Center is seeking proposals to repair the hardscape beneath the Pathfinder shuttle. Work includes demolishing and hauling away about 5,484 square feet of concrete, installing wire mesh and four underground enclosures, and placing about 102 cubic yards of new concrete. Bidders can request the project drawings and specifications by email or examine them at the Center in Huntsville, Alabama.

About this opportunity

The Alabama Space Science Exhibit Commission DBA U.S. Space & Rocket Center seeks proposals from qualified firms for additional maintenance repairs of the existing Space Shuttle Hardscape. General Specifications: Use ½” wood fiber expansion joint fillers in expansion joints between concrete slabs of differing types to prevent concrete damage due to expansion and contraction. Use additional control joints as needed to prevent random, unsightly surface fractures. All areas should use 6”x6” wire mesh reinforcement. Site Specific Scope of Work: Demolish and haul off approximately 5,484 SF of existing concrete beneath the Pathfinder shuttle, averaging 6" thick. Thoroughly protect all shuttle…

Time remaining

Closes Nov 17, 2026

19Days
:
17Hours
:
01Min
:
07Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-4EB24E