Opportunity timeline
In plain English
San Diego Unified School District is seeking a contractor to replace two 10-inch fire main backflow preventers at Thurgood Marshall Middle School, including pipe stands, testing, and certification. A C36 license is required, and attendance at the mandatory pre-bid meeting on October 29, 2026, at 10:00 AM is required.
About this opportunity
Remove and replace two (2) existing 10-inch fire main backflow preventers at Thurgood Marshall Middle School with new Watts 909RPDA OS&Y assemblies or approved equal, including new gaskets, bolt kits, and four (4) pipe stands. Scope includes backflow testing and certification. Work to be performed on District property. See attached notice for project-specific requirements and how to obtain bid documents, plans, and specifications. Department: Facilities Planning and Construction. Estimated value: 115,000.00. License required: C36. Mandatory pre-bid meeting: October 29, 2026 at 10:00 AM. Solicitation PC27-0515-52-00-00 posted by San Diego Unified School District on PlanetBids. Documents,…
Time remaining
Closes Nov 6, 2026
Related Opportunities

Watervliet Arsenal (WVA) Replacement of the 300 Line Chrome Piping

648-22-104 Correct HVAC Deficiencies (P&V)

Emergency Operations Center (EOC) Upgrade

Merced College Admin Multi-Zone Replacement Project (Rebid)

PN: 636-27-101, Design-Build, Install Temporary Chillers {OM} FY27 NRM 36C263-27-AP-0586
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-9AFDDD


