Opportunity timeline
In plain English
UCLA is seeking prequalified subcontractors for selective demolition, concrete repair, metal stud framing, insulation, and finished drywall for a 67,464-square-foot patient care reconfiguration at RRUMC’s fourth floor. Work is mainly on the fourth floor, with some areas on floors 3 and 5, outdoor decks, and Charles Young Drive. The estimated construction cost is $9,775,000. Bids are due December 3, 2026, at 2:00 PM Pacific; the pre-bid conference is November 6, 2026, at 10:00 AM Pacific.
About this opportunity
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited from prequalified Demolition, Concrete, Framing and Drywall subcontractors for the following work: Complete Selective Demolition as shown on the plans and specifications. Furnish and install concrete metal stud framing and finished level 4 drywall at the RRUMC 4th floor project site, floor area 67,464 SQ FT, per specification sections: Subcontractor to perform selective demolition, chipping/sloping and concrete repair as shown on the project plans and described in the bid package scope sheets. This work primarily takes place on the 4th level of the UCLA RRUMC,…
Time remaining
Closes Dec 3, 2026
Related Opportunities

Clamp, pulley

Film - Protective, 3M Scotchgard Multi-layer 1004, (5 Per PACK)58.44" X 31.25"

Controller - Door, Entrance & Exit

Cylinder ASM - 25 LBS, Access Doors

Door ASM - Upper Corner Pillar, Curbside
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-FC3B01


