Opportunity timeline

PostedOct 26, 2026
DeadlineDec 17, 2026

In plain English

The City of Brighton is seeking a contractor to replace deteriorated water mains, fire laterals, and service lines in the area between Bush and Southern Streets and 4th and 6th Avenues. Water mains smaller than 8 inches will be upsized to 8 inches. Questions are due November 19, 2026; documents and electronic submission are available through BidNet Direct with free vendor registration.

About this opportunity

The Core City Phase I Waterline Replacement construction project involves removing and replacing water mains, fire laterals, and service lines generally between Bush Street and Southern Street, and 4th Avenue and 6th Avenue. The original potable water mains, which are deteriorated and failing, have reached the end of their useful life. Any existing water mains smaller than 8-inch diameter will be upsized to 8-inch. Owner: Utilities. Questions due November 19, 2026. Solicitation 0000441597 posted by City of Brighton on BidNet Direct. Documents, addenda and electronic submission are on the BidNet Direct listing (free vendor registration to view and respond).

Time remaining

Closes Dec 17, 2026

49Days
:
10Hours
:
49Min
:
02Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-A8F065