Opportunity timeline

PostedOct 26, 2026
DeadlineNov 7, 2026

In plain English

Battelle Energy Alliance is seeking expressions of interest from vendors able to fabricate, inspect, and test one nuclear-grade stainless steel ATR Loop pressurizer pressure vessel, including its support legs and appurtenances. The vessel must meet ASME code and specified nuclear quality requirements; delivery is to WestOne Logistics in Idaho Falls, Idaho. Responses are due November 6, 2026, and selected vendors may be invited to a later RFP.

About this opportunity

INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors capable of fabricating an ASME Section VIII, Division 2 pressure vessel for use as the ATR Loop Pressurizer (1A-NE Loop). The fabricated vessel will play a critical role in maintaining system pressure, degassing, and surge compensation for an Advanced Test Reactor (ATR) experiment loop. BACKGROUND INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The ATR experiment loops rely on a…

Time remaining

Closes Nov 7, 2026

09Days
:
01Hours
:
54Min
:
10Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-A7A9D9