The Coast Guard wants a contractor to remove and replace a raised watertight hatch on the USCGC Stratton. The Coast Guard will provide the 60-by-60-inch replacement hatch and coaming; the contractor must install, weld, inspect, and test them. Work will take place at Coast Guard Base Alameda in Alameda, California, from November 30 to December 11, 2026. No special security requirements are listed.

About this opportunity

SOW for RWTH 01-21-1 Renew USCGC STRATTON (WMSL-752) This solicitation is to renew Raised Watertight Hatch 01-21-1 ON STRATTON The Contractor shall provide all necessary labor, supervision, tools, equipment, materials, safety controls, and services to remove and replace RWTH 01-21-1 on STRATTON. The Government will furnish the replacement 60” x 60” hatch, including the associated coaming. The Contractor shall remove the existing hatch and associated components; prepare, repair, or modify the deck opening and surrounding structure as necessary; install and weld the replacement hatch and coaming; and adjust all latches, locks, sensors, supports, and related hardware to ensure proper fit,…

Time remaining

Closes Oct 29, 2026

00Days
:
10Hours
:
51Min
:
40Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-8EAAA0