In plain English

The U.S. Army Corps of Engineers is replacing the standing seam metal roof on the Control Tower at Mosquito Creek Lake in Cortland, Ohio. Work also includes rerouting vent and exhaust pipes, adding gutters, and installing a certified non-penetrating lightning protection system. The project is estimated at $150,000–$350,000, with work due within 365 days after the written Notice to Proceed. The RFQ is expected around September 4, 2026, with award anticipated November 13, 2026.

About this opportunity

The U.S. Army Corps of Engineers (USACE), Pittsburgh District has a project that involves the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). Rough Estimate of this non-commercial construction project is between $150,000.00 and $350,000.00. The work includes rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a new, certified, non-penetrating Lightning Protection System. The North American Industrial Classification Code (NAICS) is 238160 - Roofing…

Time remaining

Closes Oct 30, 2026

01Days
:
10Hours
:
53Min
:
15Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-226802