Opportunity timeline
In plain English
Renovate a PT Solutions location in West Palm Beach, Florida, including selective demolition, concrete cutting and patching, interior finishes, doors, plumbing, HVAC, electrical, and related fire-safety work. The HVAC subcontractor must provide a new unit; the owner supplies items including light fixtures, millwork, and low-voltage work. Plans and specifications are available through the LDI online planroom, which requires an account to download them.
About this opportunity
Scope of Work: GENERAL One site visit will be scheduled to allow subcontractors to visit the site. No additional site visits will be scheduled. FINAL CLEANING Clean interior/exterior millwork, interior/exterior windows, doors, door hardware, floors, walls, toilet accessories, equipment, plumbing fixtures, exposed ductwork, light fixtures, etc. Full time supervision required. DEMOLITION Selective demolition per the plans and specifications. Remove all demolition debris from the site. Removal of all floor covering(s) including mastic. Full-time supervision with attendance at all inspections required. Daily cleanup, no exceptions. CONCRETE TRENCH CUT & POUR BACK Sawcut (utilizing a clean burn…
Time remaining
Closes Oct 29, 2026
Related Opportunities

Zygo Purchase

Infill Housing Development Gap Financing Program

Medical Equipment for the Coastal Alabama Sea Turtle Facility

Dekalb County Technology Center Rainsville, AL

Lab 104 Cell E PLC
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-D0A1E0

