Opportunity timeline
In plain English
Replace Boise State University’s existing multi-zone air handler, return fan, chilled water pump, and related accessories. The work also includes a new steam converter, heating water pump and piping, plus integration with the existing Johnson Controls building automation system. The estimated cost is $1,492,000, and a pre-bid meeting is scheduled for October 29, 2026, at 2:00 p.m. Plans are available through Docuproject, which requires an account to download them.
About this opportunity
Job Description A description of the Work ofthis project can be summarized to include: The Removal and replacement of the existing multi-zone air handling unit and associated return fan, chilled water pump, and accessories. Additionally, the scope includes the installation of a new steam converter, heating water pump, piping, and accessories. The heating water piping will be extended to serve the new multi-zone unit. Integration of the Johnson Controls (JCI) building automation system will be provided by extending the existing system from the nearby Student Union building. Estimated Cost:$1,492,000 To access these project files digitally, you must register with Docuproject. Project posted…
Time remaining
Closes Nov 19, 2026
Related Opportunities

Cold Weather Gear

Kleiner Park Pond Shoring

Water Scooper Multiple Award IDIQ

Big Springs Horse Corral Replacement

Available for Licensing: Fluorescent Tracer Technology for Hydrofluoric Acid Exposure Detection
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-7E24DC


