Replace Boise State University’s existing multi-zone air handler, return fan, chilled water pump, and related accessories. The work also includes a new steam converter, heating water pump and piping, plus integration with the existing Johnson Controls building automation system. The estimated cost is $1,492,000, and a pre-bid meeting is scheduled for October 29, 2026, at 2:00 p.m. Plans are available through Docuproject, which requires an account to download them.

About this opportunity

Job Description A description of the Work ofthis project can be summarized to include: The Removal and replacement of the existing multi-zone air handling unit and associated return fan, chilled water pump, and accessories. Additionally, the scope includes the installation of a new steam converter, heating water pump, piping, and accessories. The heating water piping will be extended to serve the new multi-zone unit. Integration of the Johnson Controls (JCI) building automation system will be provided by extending the existing system from the nearby Student Union building. Estimated Cost:$1,492,000 To access these project files digitally, you must register with Docuproject. Project posted…

Time remaining

Closes Nov 19, 2026

21Days
:
12Hours
:
44Min
:
55Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-7E24DC