Opportunity timeline

PostedOct 20, 2026
DeadlineNov 17, 2026

In plain English

The Town of Manchester Water and Sewer Department is seeking a contractor to replace Siphons 1 and 3 and repair their associated discharge valves at the Globe Hollow Water Treatment Plant. The work must match repairs to Siphons 2 and 4; Siphon 1 must be returned to service before work proceeds to Siphon 3, while the plant remains operational. The Town will drain both sedimentation basins before work begins.

About this opportunity

The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to replace Siphon No. 1 and Siphon No. 3 at the Globe Hollow Water Treatment Plant, and to repair the associated discharge valves in the trough. Finished work shall match the repairs already completed on Siphon Nos. 2 and 4. Sequence may change due to operational needs. Both sedimentation basins that house the siphons will be drained by the Town before the start of the work. Siphon No. 1 shall be completed and returned to service first. Siphon No. 3 shall follow. The plant will remain in operation. Posted by Town of Manchester on OpenGov Procurement. Sourced from OpenGov Procurement, where plans,…

Time remaining

Closes Nov 17, 2026

19Days
:
09Hours
:
52Min
:
10Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-C0D17D