In plain English
Charlotte Douglas International Airport is seeking a contractor for the first construction package of its South Ramp Expansion. Work includes pavement demolition and paving, grading, drainage, erosion control, pavement markings, and airfield electrical installation. A hybrid pre-bid meeting is scheduled for October 27, 2026, at 9:00 a.m. ET; bids are submitted through the e-Builder portal.
About this bid
The South Ramp Expansion Program for Charlotte Douglas International Airport (CLT or the Airport) is the first piece of construction of the overall program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. The scope of work will include but is not limited to pavement demolition, cement concrete pavement, asphalt shoulder paving, grading, drainage, erosion and sediment control, pavement markings, and airfield electrical installation. Pre-Bid Meeting DATE AND TIME: October 27, 2026 at 9:00 AM ET PRE-BID TYPE: Hybrid (in-person and virtual options) PRE-BID LOCATION (in-person option): CLT Center,…
Details
- Agency
- Charlotte Douglas International Airport
- Classification (PSC)
- Construction
- Place of performance
- Charlotte, North Carolina
How to access this bid
Click “View the original posting” — it opens this solicitation on the City of Charlotte’s website (Charlotte Douglas International Airport solicitations).
Viewing the posting and its document list is public — no account needed.
Responses go through the e-Builder bidding portal linked under “Related Information” on that page — register there and submit before the deadline.
Documents
Listed on the original posting. Download them from the agency's portal.
- AVIA-ITB-27-15-South-Ramp-Expansion-BP-1.pdf

