Opportunity timeline

PostedOct 18, 2026
DeadlineDec 2, 2026

In plain English

FDOT is seeking a contractor to resurface about 4.2 miles of SR 5 (US 1/Federal Highway) in Indian River County, from north of 87th Street to south of Sebastian Boulevard. Work also includes traffic control, guardrails, concrete, drainage, signs, pavement markings, signals, lighting, utility adjustments, and sod. The estimated budget is $7,640,310, with 377 contract days. Bids are due through Bid Express by October 28, 2026, at 10:30 a.m. Eastern.

About this opportunity

The Improvements under this Contract consist of but are not limited to, MOT (standard, temporary signalization and maintenance, temporary traffic detection and maintenance, pedestrian special detour, speed and law enforcement), protection (sediment barrier, floating and staked turbidity, barrier, and inlet protection system), guardrail (removal, TL-3 guardrail, shallow encased posts, end treatments), concrete (removal, curb, and sidewalk), asphalt (reconstruction, milling, resurfacing and miscellaneous asphalt under guardrail), drainage (inlet, pipe culvert, mitered end), signing (single-post, multi-post, panel, retroreflective sign strip, tubular marker, and object marker), pavement…

Time remaining

Closes Dec 2, 2026

34Days
:
08Hours
:
19Min
:
36Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-7FCC64