Opportunity timeline

PostedOct 18, 2026
DeadlineNov 4, 2026

In plain English

The project adds about 1,075 square feet of second-floor space inside the Leatherman Peak building at Boise State University, 1311 Belmont Street in Boise. Work includes selective demolition, changes to first-floor ceilings and office space, a new stair, and relocated millwork. The estimated cost is $622,000. A pre-bid meeting is scheduled for October 14, 2026, at 2:00 p.m.; plans and specifications require a Docuproject account to download.

About this opportunity

A description of the work of this project can be summarized to include addition of an approximately 1,075 square foot second floor area within the existing entry/open office portion of the Leatherman Peak building on the Boise State campus, located at 1311 Belmont Street, in Boise Idaho. The project includes, but is not limited to, selective demolition and reconfiguration of first floor conference room and office space ceilings, the addition of a second story and stair, and the relocation of millwork within the adjacent receiving bay as described in the construction documents. Estimated Cost:$622,000.00 To access these project files digitally, you must register with Docuproject. Project…

Time remaining

Closes Nov 4, 2026

06Days
:
14Hours
:
47Min
:
05Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-2BE475