Opportunity timeline
In plain English
The Town of East Greenwich is seeking a contractor to replace the roof at Fire Station #1, including repairs to failed flashing and sealing at a masonry-to-roof interface. The station must remain fully operational, with fire vehicle doors and aprons unobstructed throughout construction. A mandatory pre-bid conference is October 23, 2026, and questions are due October 27, 2026.
About this opportunity
Roof replacment - Fire Station 1 This is an accelerated project and must be completed by the project completion date. Further, the Fire Station will be fully operational during the construction project duration. It is imperative that all fire vehicle overhead doors and associated building vehicle aprons be unobstructed at all times. Provisions for a site dumpster may be possible on the side street with prior written approval by the TM. The Town has experienced water intrusion along the addition at a masonry-to-roof interface where existing flashing and sealant have failed. Correction of this condition is included in the Base Bid. Bidders shall inspect this area during the mandatory pre-bid…
Time remaining
Closes Oct 29, 2026
Related Opportunities

Municipal Legal Services-Criminal Prosecution

DEM HVAC System Replacement, Electrification, NBNERR Field Station

QLV27007039 URI Engineering Consultant for Utility Modeling

TENTS for Ric – Frame Style 20’ X 30’

Lincoln High School Diplomas and Graduation
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-6559D4

