Opportunity timeline
In plain English
Coastal Carolina University is seeking a prime contractor to remove two boilers at the Singleton Building energy plant and install two 3,500 MBH input condensing boilers in phases. The project is in Conway, South Carolina, with an estimated construction cost of $400,000 to $490,000; the prime contractor must hold a Heating (HT) license.
About this opportunity
Remove two (2) boilers at the Singleton Building energy plant and replace with two (2) 3,500 MBH input condensing boilers in a phased approach. Solicitation number: H17-SEBR-MA. Project location: Coastal Carolina University, 103 Tom Trout Drive, Conway. Construction cost range: $400,000 to $490,000. Delivery method: Design-Bid-Build. Prime contractor license: Heating (HT). Point of contact: Mark Avant ([email protected]). Full details and documents: https://www.coastal.edu/facilities/projects/
Time remaining
Closes Nov 5, 2026
Related Opportunities
Purchase delivery of Residential Appliances and Accessories

Festo Training Equipment
Festo Training Equipment
Air Handler Replacement at UEC, CEC, and JDC Annex - CEC
Website Hosting
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-C8F8BF

