Opportunity timeline

PostedOct 13, 2026
DeadlineNov 10, 2026

In plain English

The City of Palm Springs seeks a contractor to fabricate and install aluminum odor-control covers over two existing 100-foot primary clarifiers, including demolition, ductwork tie-ins, and electrical, structural, and mechanical modifications. Work must keep wastewater treatment operating, with only one clarifier out of service at a time, and be completed within 250 working days. A Class A license is required, and the mandatory pre-bid meeting is October 22, 2026, at 10:00 AM.

About this opportunity

This project involves the fabrication and installation of two aluminum flat covers over two existing 100-foot primary clarifiers to enhance odor control. Core activities include demolition of existing launder covers, demolition of existing clarifier walkways, installation of new flat covers over the full surface area of each clarifier, installation of new launder covers, ducting tie-ins to an existing odor control system, and completion of all required electrical, structural, and mechanical modifications. Emphasis will be placed on maintaining uninterrupted wastewater treatment activities with a high standard of safety throughout all phases of the work. The work shall be diligently…

Time remaining

Closes Nov 10, 2026

12Days
:
14Hours
:
54Min
:
01Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-52FE2A