Opportunity timeline
In plain English
Chula Vista Elementary School District is seeking bids for roofing replacement at various school locations. The district may award separate contracts for each bid package or one contract covering all sites. Contractors must receive owner-furnished materials at a secure yard or warehouse between March 1 and 31, 2027; the mandatory pre-bid meeting is November 3, 2026, at 10:00 a.m.
About this opportunity
Contractor is required to receive all Owner-Furnished material at the Contractor's secure yard or warehouse between March 1-31, 2027. Sheet metal to be delivered to Contractor’s yard. At the District’s discretion, the contract may be awarded in one of two ways : 1. Two separate contracts – one for each bid package, awarded to the lowest responsive, responsible bidder for each package. 2. A single contract – covering all school sites, awarded to the lowest responsive, responsible bidder based on the total bid amount. Department: Purchasing. Mandatory pre-bid meeting: November 3, 2026 at 10:00 AM. Solicitation 26/27-7 posted by Chula Vista Elementary School District on PlanetBids. Documents,…
Time remaining
Closes Nov 18, 2026
Related Opportunities

Renovate Space for Patient Care Improvements

W911SA26RA040 Sources Sought

Citywide Sewer Main Televising and Line Cleaning Maintenance Services

MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)

Minor General Construction MACC at NSA Crane and Glendora Test Facility
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-FABF32


