Opportunity timeline
In plain English
Mountainside Resort is seeking a contractor to connect the resort to Stowe’s public water system, install a booster pump system and controls, and abandon the existing well. Bids are due October 30, 2026, at 1:00 PM; a site pre-bid meeting is scheduled for October 8 in Stowe. The project has federal funding requirements, including Davis-Bacon wages and U.S.-made materials provisions.
About this opportunity
Sealed Bids for the construction of the Mountainside Resort/Stowe Interconnection Project will be received by Mountainside Resort at Stowe Owners Association, Inc. (Mountainside) at the office of Weston & Sampson Engineers (98 South Main Street, Waterbury, VT 05676), until 1:00 PM local time on October 30, 2026, at which time the Bids received will be publicly opened and read. The Project consists of: Connection to the Stowe Public Water System, Installation of new booster pump system, controls, and other appurtenances, and abandonment of the existing water supply well. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive…
Time remaining
Closes Oct 30, 2026
Related Opportunities

White River Junction Aseptic Cleaning Contract

Rutland High School/Stafford Technical Center Pump Station Conversion Project

MT. Holly ER P23-1(334)

Upcoming Construction Opportunity: Land Port of Entry Highgate Springs, VT

NSCF Fire Pump Replacement
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-578E0F

