Opportunity timeline

PostedOct 1, 2026
DeadlineOct 29, 2026

In plain English

The City of Pismo Beach is replacing the Bello Reservoir’s liner and floating cover, including removal of the existing cover, concrete surface preparation and minor repairs, and replacement of a 12-inch fill pipe. The work includes leak testing and disinfection; bidders need a Class A license. A pre-bid meeting is scheduled for October 15, 2026, at 10:00 AM.

About this opportunity

The project consists of removal and disposal of the existing floating cover system; cleaning and preparation of the exposed concrete reservoir surfaces; minor concrete crack and construction joint repairs; removal and replacement of the existing 12-inch reservoir fill pipe and fittings with new C900 PVC pipe and fittings; furnishing and installation of a new reservoir liner system, conductive underlayment, and floating flexible membrane cover system; liner leak testing; disinfection; and all incidental and appurtenant work required for a complete installation. The replacement floating cover system shall be installed generally in kind with the Layfield Shop Drawings document included as…

Time remaining

Closes Oct 29, 2026

00Days
:
16Hours
:
50Min
:
00Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-60C847