Opportunity timeline
In plain English
The Navy wants a contractor to repair, test, and inspect Recorder, Signal DAT units and return them to ready-for-issue condition. The contractor must provide the labor, parts, tools, and testing equipment; the notice also calls for a monthly repair-capacity estimate. Submit a quote by email to the Navy contact by the due date listed on page 1, block 10.
About this opportunity
Please submit quote via email to [email protected] by the due date specified on page 1, block 10. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the…
Time remaining
Closes Oct 29, 2026
Related Opportunities

NAWCAD WOLF Tactical Voice Conferencing System (TVCS) Basic Ordering Agreement Task Order - 3

FCR Interface BOX

Control-indicator

Interface Unit,comm, in Repair/modification of

Electrical Amplifier-Filter Assembly (N0038326PR0R617_FMS)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-7FE41D

