The City of Truth or Consequences is seeking bids to replace and install waterlines using open-trench and trenchless methods. The work includes about 35,700 feet of open-trench waterline, additional jack-and-bore and directional-drilling sections, 316 water service connections with meters, and restoration of affected streets and sidewalks. Questions are due October 8, 2026; bids are submitted through BidNet Direct, which requires free vendor registration.
About this opportunity
The project includes the replacement and new installation of waterlines using open trench, jack and bore, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 116 linear feet (LF) of 4-inch, 31,508 linear feet (LF) of 6-inch, 2,812 LF of 8-inch, and 888 linear feet (LF) of 10-inch C-900 DR-18 PVC waterline. All waterline replacements will be installed parallel to the existing waterlines. The project also includes the installation of approximately 70 LF of 8-inch waterline carrier pipe within a 16-inch steel casing by jack and bore, and 60 LF of 10-inch waterline carrier pipe within an 18-inch steel casing by jack and bore, both under NMDOT…
Time remaining
Closes Oct 29, 2026
Related Opportunities

AMENDMENT - Hermits Peak/Calf Canyon Fire Claims Arbitration Services

UNMH Stop Loss Insurance Coverage

Material Recovery Facility

Hillsboro NM Community Center Door and Window Rehabilitation

Hillsboro NM Community Center Adobe Restoration
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-15A319