Opportunity timeline
In plain English
The Navy wants a contractor to repair, upgrade, test, and inspect igniter spark gas units, part number 3888058-7 and NSN 2925-015835619. The contractor must provide the facility, labor, materials, replacement parts, tooling, and testing needed to return the units to ready-for-issue condition. The required repair turnaround time is 110 days after receipt, with induction ending 365 days after award; the notice is marked as an award.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Oct 30, 2026
Related Opportunities

Lens,light

Ignition System,engine

Light Assembly,indicat

Lens Assembly

Wiper Controllers and Wiper Assemblies
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-94C78A

