Opportunity timeline

PostedSep 11, 2026
DeadlineSep 25, 2026

In plain English

West County Wastewater wants a contractor for civil work supporting an in-line assessment of the Tara Hills Force Main. The work includes installing launch and receive barrels, replacing a plug valve with a full-port gate valve, bypasses and line-stops, potholing, pig and probe support, supplemental water, and site restoration at multiple locations. Bids must be submitted through OpenGov, but the posting does not provide a usable submission date or time.

About this opportunity

West County Wastewater ("WCW") is accepting sealed bids via their e-Procurement Portal, OpenGov until 'Proposal Submission Date , 'Proposal Submission Time PST. Late submissions shall not be accepted. WCW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an in-line assessment of the Tara Hills Force Main. The assessment will require launching and receiving a series (approximately 3) progressive pigs and one (1) diagnostic and mapping pig (probe). To perform this in-line phase of the assessment, Civil work is required to install a Launch Barrel, install a Receive Barrel, and remove a plug valve and replace it with a full-port gate valve. By-passes and line-stops will be…

Time remaining

Closes Sep 25, 2026

11Days
:
22Hours
:
28Min
:
53Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-9F2EAA