Opportunity timeline

PostedSep 12, 2026
DeadlineOct 6, 2026

In plain English

WHCMUD No. 21 is seeking construction of Lift Station No. 8. The work includes a 6-foot precast wastewater lift station, two submersible pumps, piping, valves, fittings, electrical controls, site work, and a 55kW diesel generator. Plans, addenda, and bidding are managed through CivCast, and the project was posted by EHRA Engineering on the district’s behalf.

About this opportunity

Project scope shall include the construction and installation of a 6-foot pre-cast wastewater lift station, including two (2) submersible pumps and all associate piping, valves and fittings, electrical controls, site work and 55kW diesel generator. Posted by EHRA Engineering on behalf of WHCMUD No. 21. Sourced from CivCast, where plans, addenda, and bidding are managed.

Time remaining

Closes Oct 6, 2026

22Days
:
12Hours
:
52Min
:
29Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-A35920