PostedSep 11, 2026
DeadlineSep 17, 2026

In plain English

The Department of Defense wants a contractor to design and build about 7,900 feet of high-pressure waterline at Kirtland Air Force Base, including an 8-inch ductile iron pipe, valves, SCADA controls, hoist, booster pumps, and two new tanks with a packaged pump station. A site visit is scheduled for September 3, 2026, at 1:00 p.m. MST, with attendees meeting at the Truman Gate Visitors Center at noon. Attendees must provide required identity and citizenship information by August 28, 2026, and may need security verification or base passes.

About this opportunity

The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new…

Time remaining

Closes Sep 17, 2026

03Days
:
21Hours
:
29Min
:
56Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-7D4DFE