The government wants a unit-price contractor to perform maintenance dredging in the Pensacola Harbor Entrance Channel. Work may use cutterhead pipeline, trailing suction hopper, or mechanical dredges, with crews, support equipment, tugs, and floating plants. Dredging must reach 39 feet, and sand will be placed along Perdido Key Beach, up to about 30,000 feet away.
About this opportunity
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
Time remaining
Closes Oct 13, 2026
Related Opportunities

Lake Pontchartrain Tributaries, Tchefuncte River Bar Channel, Maintenance Dredging, St. Tammany Parish, Louisiana ED 26-009

CMC Greenspace

Ak-yukon Delta NWR-MX Entry Pilings

GUSG Habitat Hydro-logic Restoration 202

Conant Bank Stabilization
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-53BE6C