Greenway Feasibility Study

Opportunity timeline

In plain English
The City of South Fulton wants a feasibility study for a proposed greenway trail and related improvements. The study will examine design, funding, permits, construction, operations, maintenance, costs, benefits, risks, and alternatives. An optional virtual pre-bid meeting is scheduled for September 18, 2026, at 11:00 a.m. ET. Contact David Bryant at [email protected].
The Greenway Feasibility Study is a planning document requested to determine whether a proposed trail (and related improvements) can realistically be designed, funded, permitted, constructed, operated, and maintained. It helps decision-makers understand costs, benefits, risks, and potential alternatives before advancing to design. Pre-bid meeting (attendance optional): Sep 18, 2026 @ 11:00 AM ET at Virtual. Point of contact: David bryant ([email protected]). Event PE-66020-NONST-2027-000000102 on the Georgia Procurement Registry (GPR), Georgia's statewide bid posting site. Full documents and how to respond are on the posting — viewing is public.
Time remaining
Closes Oct 29, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-2BECC4