AMRT Telescoping Mast

Opportunity timeline

In plain English
The Department of the Army wants a commercial telescoping mast to replace a critical component used by the Air and Marine Reconnaissance Team. The mast must extend to 20 feet, weigh under 205 pounds, support a 200-pound payload, and meet several construction, safety, mounting, and setup requirements. An amendment extends the closing date and time, and updated questions and answers are available as of September 3, 2026.
See attached amendment to extend closing date and time. ***SEE ATTACHED Q&A SET AS OF 03 SEP 2026*** Product Description TELESCOPING MAST PRODUCT DESCRIPTION The FLNG-CDP requires a life cycle replacement for a critical component of the YF309J, Trailer, Special Purpose-the primary telescopic tower utilized by the Air and Marine Reconnaissance Team (AMRT) during reconnaissance and observation (R&O). AMRT seeks a commercial off the shelf platform that provides next generation command and control (NGC2), on the move (OTM) and at the halt (ATH) capabilities. The desired platform must meet the following capabilities: - Base tube diameter is not more than seven inches. - No more than 6 mast…
Time remaining
Closes Sep 15, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-AD7AB0