Opportunity timeline

PostedSep 10, 2026
DeadlineSep 15, 2026

In plain English

The Navy wants repairs and upgrades at a wastewater treatment plant and the G575 lift station. Work includes replacing parts in secondary clarifier No. 4, control panels for all four clarifiers, manholes and piping, submersible pumps, and the wet-well crane. The description does not provide a location, bidder requirements, quantity beyond the listed equipment, or key dates.

About this opportunity

The work includes replacement of secondary clarifier no. 4 internal components, replacement of control panels for all four secondary clarifiers. (PWO 24-0045) The work at G575 includes phased construction of upgrades to manholes and piping(removal/replacement/new installation); removal and replacement of submersible pumps and removal and replacement of the existing crane over the wet well. (PWO 26-0044)

Time remaining

Closes Sep 15, 2026

01Days
:
11Hours
:
04Min
:
13Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-6EF87C