Wake Island Airfield Fiber Installation from Lightning to Weather Instruments

Opportunity timeline

In plain English
The Air Force wants a contractor to engineer, supply, install, and test 12 strands of single-mode blown fiber-optic cable on Wake Island. The cable will run from the Lightning Vault Building 1603 to the ATCALS weather instrument, with new fiber distribution panels installed by the contractor.
Engineer, furnish, install and test (EFI&T) 12 new Strands (St) of Single Mode (SM) blown Fiber Optic Cable (FOC) from the Lightning Vault Building (Bldg. 1603) to ATCALS Weather Instrument (no bldg. number) on Wake Island (WI). These fiber strands shall be installed in the new fiber optic distribution panels (FODPs) to be installed by the Contractor.
Time remaining
Closes Sep 18, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-8E9DEE