Opportunity timeline

PostedSep 10, 2026
DeadlineSep 25, 2026

In plain English

The Department of Defense wants relocatable modular power generation and distribution systems for 10–12 sites across the 50 states. The systems must handle and stabilize large, rapidly changing power loads and include manufacturing, procurement, shipping, delivery, installation, and testing. Implementation is required by February 28, 2028.

About this opportunity

Other Transactional Authority Request for White PapersModular Power Generation and Distribution: The Department of Defense has an urgent, unmet requirement for relocatable Modular Power Generation and Distribution solutions. These systems are unique that must be capable of supplying and stabilizing large transient loads that are typically problematic for traditional power generation solutions. A solution is required at various locations across the 50 United States. Current operational sites lack the foundational power generation and distribution architecture necessary to support modern, power-intensive mission equipment. There is a critical need for these solutions to be implemented no…

Time remaining

Closes Sep 25, 2026

11Days
:
17Hours
:
50Min
:
55Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-FE1968