Opportunity timeline
In plain English
Long Beach Utilities Department wants a contractor to repair and rebuild an existing retaining wall along the Los Cerritos Channel at Bixby Hill. The work includes removing damaged concrete masonry wall sections, trees, and interfering foundation and pool equipment, plus backfilling, compaction, and restoring the site. Solicitation UD-26-359 is posted on the Long Beach Buys procurement portal.
About this opportunity
The Work includes repair and reconstruction of an existing retaining wall along the Los Cerritos Channel at Bixby Hill, including demolition of deteriorated sections of the existing Concrete Masonry Unit retaining wall, removing existing trees, and disposing of interfering portions of the existing foundation and pool equipment, backfill and compaction, site restoration, and/or other work as necessary to complete the project as described in the Contract Drawings and Specifications. Point of contact: Wade Depew ([email protected]). Solicitation UD-26-359 from Long Beach Utilities Department. Full documents and how to respond are on Long Beach Buys, the City of Long Beach…
Time remaining
Closes Oct 13, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-704C6A


