Opportunity timeline

PostedSep 9, 2026
DeadlineOct 14, 2026

In plain English

Pennsylvania’s Department of Corrections is seeking design and engineering firms for electrical distribution and gate-control upgrades at SCI Huntingdon in Huntingdon, Pennsylvania. The work includes replacing low-voltage cabling and panels, expanding emergency-generator coverage, and replacing controls, motors, and assemblies for three gates. The estimated construction cost is $7 million, and applications are due October 14, 2026, at 4:30 p.m. Applicants need an active Vendor/SAP number, must apply through Trimble Unity Construct, and must meet or make a good-faith effort toward 21% SDB and 3% VBE participation goals.

About this opportunity

PROJECT NUMBER: DGS C-0572-0029 Phase 1 PROJECT TITLE: SCI Huntingdon – Low Voltage Distribution Panels and Gate Controls PROJECT LOCATION: 1100 Pike Street, Huntingdon, PA 16652 This Project is advertising for PROFESSIONAL SELECTIONS for design and/or engineering services. BRIEF DESCRIPTION: The scope of work is intended to replace low voltage cabling and distribution panels from low voltage feeders to low voltage Main Distribution Panels (MDP) in the institution. Provide aerial line from Generator room to Bldg. #53, to add all outbuildings to Main Distribution Switch gear and provide Emergency Generator coverage. Replace Analog Gate controls at 2 Gate and Front Gate with PLC controlled…

Time remaining

Closes Oct 14, 2026

30Days
:
18Hours
:
11Min
:
22Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-2A76A4