Opportunity timeline

PostedSep 11, 2026
DeadlineSep 29, 2026

In plain English

The Town of Shrewsbury is seeking a contractor for Phase 4 of its Fiber to the Premise project, including fiber-optic cable installation, splicing, and testing. Full bid documents and instructions are available through COMMBUYS; submitting a quote requires a free account. Contact Taryn Maddocks at [email protected].

About this opportunity

FTTP Project Phase 4 Fiber Optic Cable Installation, Splicing & Testing Fiber to the Premise (FTTP) was chosen as the preferred upgrade method in consideration to the current and future needs of SELCO. Following the identification and adoption of the FTTP model the design process began as a key component of this strategy using the following planning and design concepts Point of contact: Taryn Maddocks ([email protected]). Solicitation BD-25-1324-SELCO-SELCO-131526 from Town of Shrewsbury. Full documents and how to quote are on COMMBUYS, the Commonwealth of Massachusetts procurement portal (viewing is public; quoting needs a free COMMBUYS sign-in).

Time remaining

Closes Sep 29, 2026

15Days
:
05Hours
:
20Min
:
54Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-C000E6