Opportunity timeline

PostedSep 10, 2026
DeadlineSep 25, 2026

In plain English

The U.S. Army Corps of Engineers plans to replace the Rough River Lake Axtel Wastewater Treatment Plant. Work includes demolishing the existing plant, building a new subsurface wastewater treatment and drip-dispersal system, installing piping, electrical and controls, and restoring the site. Rock excavation is an optional unit-priced item.

About this opportunity

Description of Proposed Work: The U.S. Army Corps of Engineers (USACE), Louisville District, anticipates issuing an Invitation for Bids (IFB) for a firm-fixed-price construction contract to execute the Rough River Lake Axtel Wastewater Treatment Plant Replacement. The overall scope of work comprises the complete demolition and decommissioning of the existing wastewater treatment plant and the construction of a new replacement subsurface sewage treatment and dispersal facility. Primary features of work include, but are not limited to:Demolition and Removal: Demolition and disposal of the existing Axtel Wastewater Treatment Plant, existing chain-link perimeter fencing, and gravel…

Time remaining

Closes Sep 25, 2026

11Days
:
06Hours
:
40Min
:
42Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-981324